Construction starts at downtown San Jose office, retail project
https://www.siliconvalley.com/2021/08/24/construct-key-downtown-san-jose-office-retail-restaurant-real-estate/
SAN JOSE — A wide-ranging redevelopment project is underway to transform a long-shuttered movie theater in downtown San Jose into a thriving office, retail, and restaurant complex.
Urban Catalyst has begun the reconstruction of the old Camera 12 movie theater site, which the developer aims to finish by no later than September 2022.