Restart of big downtown San Jose tech campus is being “actively” eyed by its developer

Restart of big downtown San Jose tech campus is being “actively” eyed by its developer

3 years ago
Anonymous $np3LcwuhSi

https://www.siliconvalley.com/2021/10/27/big-downtown-san-jose-tech-develop-platform-16-google-real-estate/

SAN JOSE — A restart of a huge tech campus in downtown San Jose near the footprint of the Google transit village and the Diridon train station is being “actively” considered for 2022, a top executive with the project’s developer said Wednesday.

Platform 16 broke ground in March 2020 at the very outset of the coronavirus outbreak, but construction was soon halted as a result of the shutdown of economic activity that included wide-ranging exits of companies from offices in the Bay Area and worldwide.

Restart of big downtown San Jose tech campus is being “actively” eyed by its developer

Oct 27, 2021, 7:45pm UTC
https://www.siliconvalley.com/2021/10/27/big-downtown-san-jose-tech-develop-platform-16-google-real-estate/ > SAN JOSE — A restart of a huge tech campus in downtown San Jose near the footprint of the Google transit village and the Diridon train station is being “actively” considered for 2022, a top executive with the project’s developer said Wednesday. > Platform 16 broke ground in March 2020 at the very outset of the coronavirus outbreak, but construction was soon halted as a result of the shutdown of economic activity that included wide-ranging exits of companies from offices in the Bay Area and worldwide.